Brantley Solar

Solar power plant · Nash County, North Carolina

Nameplate capacity
50 MW
Rank in North Carolina
#78
of 930 plants
In service since
2018
October 2018

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
John Laing US Solar Corp.
County
Nash County
Generating units
1
Share of state capacity
0.13%
Rank among solar plants in North Carolina
#35 of 758
EIA plant code
60623

Generating units

Individual generating units at Brantley Solar
UnitTechnologyNameplateSummerOnlineStatus
PV1Solar Photovoltaic50 MW50 MW2018Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in North Carolina

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 50 MW solar plant and a 50 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All North Carolina power plants · What North Carolina actually generates