Baltimore Church Solar, LLC
Solar power plant · Robeson County, North Carolina
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Altus Power America Management, LLC
- County
- Robeson County
- Generating units
- 1
- Share of state capacity
- 0.01%
- Rank among solar plants in North Carolina
- #111 of 758
- EIA plant code
- 60144
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| FLS1 | Solar Photovoltaic | 5.4 MW | 5.4 MW | 2017 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in North Carolina
| Hot Springs Energy Storage & Microgrid | Battery storage | 6.3 MW |
| Woodleaf Solar Facility | Solar | 6.0 MW |
| Eastside WWTP | Other | 5.4 MW |
| Gastonia, Tulip Drive | Other | 5.4 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 5.4 MW solar plant and a 5.4 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All North Carolina power plants · What North Carolina actually generates