Home / Power plants / North Carolina / 232 Long Branch 29 Solar I, LLC

232 Long Branch 29 Solar I, LLC

Solar power plant · Cleveland County, North Carolina

Nameplate capacity
2.0 MW
Rank in North Carolina
#765
of 930 plants
In service since
2018
August 2018

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Cardinal Renewables
County
Cleveland County
Generating units
1
Share of state capacity
0.00%
Rank among solar plants in North Carolina
#628 of 758
EIA plant code
63296

Generating units

Individual generating units at 232 Long Branch 29 Solar I, LLC
UnitTechnologyNameplateSummerOnlineStatus
NCLFTSolar Photovoltaic2.0 MW2.0 MW2018Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in North Carolina

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 2.0 MW solar plant and a 2.0 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All North Carolina power plants · What North Carolina actually generates