Pluma - Reynolds (CSG)
Solar power plant · Otero County, New Mexico
Nameplate capacity
5.0 MW
Rank in New Mexico
#127
of 169 plants
In service since
2026
January 2026
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Standard Solar
- County
- Otero County
- Generating units
- 1
- Share of state capacity
- 0.03%
- Rank among solar plants in New Mexico
- #66 of 105
- EIA plant code
- 69557
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| REYNO | Solar Photovoltaic | 5.0 MW | 5.0 MW | 2026 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in New Mexico
| Middle Daisy | Solar | 5.0 MW |
| Pluma - Pino | Solar | 5.0 MW |
| Pluma - SLT Las Cruces | Solar | 5.0 MW |
| SLO-1 Community Solar | Solar | 5.0 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 5.0 MW solar plant and a 5.0 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All New Mexico power plants · What New Mexico actually generates