Home / Power plants / New Mexico / Pluma - Clovis Concrete North CSG

Pluma - Clovis Concrete North CSG

Solar power plant · Curry County, New Mexico

Nameplate capacity
3.4 MW
Rank in New Mexico
#141
of 174 plants
In service since
2026
April 2026

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Standard Solar
County
Curry County
Generating units
1
Share of state capacity
0.02%
Rank among solar plants in New Mexico
#79 of 110
EIA plant code
69556

Generating units

Individual generating units at Pluma - Clovis Concrete North CSG
UnitTechnologyNameplateSummerOnlineStatus
CLOCNSolar Photovoltaic3.4 MW3.4 MW2026Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in New Mexico

About this data

From EIA’s inventory of operable generators, August 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 3.4 MW solar plant and a 3.4 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All New Mexico power plants · What New Mexico actually generates