Home / Power plants / New Mexico / Mesalands Comm College Wind Turbine

Mesalands Comm College Wind Turbine

Wind power plant · Quay County, New Mexico

Nameplate capacity
1.5 MW
Rank in New Mexico
#155
of 169 plants
In service since
2008
December 2008

Details

Primary fuel
Wind
Technology
Onshore Wind Turbine
Operator
Mesalands Community College
County
Quay County
Generating units
1
Share of state capacity
0.01%
Rank among wind plants in New Mexico
#31 of 31
EIA plant code
57106

Generating units

Individual generating units at Mesalands Comm College Wind Turbine
UnitTechnologyNameplateSummerOnlineStatus
1Onshore Wind Turbine1.5 MW1.5 MW2008Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in New Mexico

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 1.5 MW solar plant and a 1.5 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All New Mexico power plants · What New Mexico actually generates