Home / Power plants / New Mexico / Encino Solar Energy Center

Encino Solar Energy Center

Solar power plant · Sandoval County, New Mexico

Nameplate capacity
55 MW
Rank in New Mexico
#53
of 169 plants
In service since
2020
July 2020

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Exus New Mexico
County
Sandoval County
Generating units
1
Share of state capacity
0.31%
Rank among solar plants in New Mexico
#15 of 105
EIA plant code
63860

Generating units

Individual generating units at Encino Solar Energy Center
UnitTechnologyNameplateSummerOnlineStatus
ESECSolar Photovoltaic55 MW55 MW2020Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in New Mexico

Jicarilla Solar 1 LLCSolar70 MW
Roswell Solar, LLCSolar70 MW
Macho SpringsSolar55 MW
Chino MinesNatural gas54 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 55 MW solar plant and a 55 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All New Mexico power plants · What New Mexico actually generates