Home / Power plants / New Mexico / Britton Solar Energy Center

Britton Solar Energy Center

Solar power plant · Torrance County, New Mexico

Nameplate capacity
50 MW
Rank in New Mexico
#58
of 169 plants
In service since
2019
December 2019

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Exus New Mexico
County
Torrance County
Generating units
1
Share of state capacity
0.28%
Rank among solar plants in New Mexico
#17 of 105
EIA plant code
63579

Generating units

Individual generating units at Britton Solar Energy Center
UnitTechnologyNameplateSummerOnlineStatus
BSECSolar Photovoltaic50 MW50 MW2019Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in New Mexico

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 50 MW solar plant and a 50 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All New Mexico power plants · What New Mexico actually generates