Mount Laurel Solar 2 LLC CSG
Solar power plant · Burlington County, New Jersey
Nameplate capacity
1.9 MW
Rank in New Jersey
#286
of 425 plants
In service since
2026
April 2026
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Dimension Energy LLC
- County
- Burlington County
- Generating units
- 1
- Share of state capacity
- 0.01%
- Rank among solar plants in New Jersey
- #211 of 343
- EIA plant code
- 69827
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| MTLA2 | Solar Photovoltaic | 1.9 MW | 1.9 MW | 2026 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in New Jersey
| IGS Solar I - EWR5 | Solar | 1.9 MW |
| IGS Solar I - EWR6 | Solar | 1.9 MW |
| Summit Associates | Solar | 1.9 MW |
| USAA Black Bear Energy | Solar | 1.9 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 1.9 MW solar plant and a 1.9 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All New Jersey power plants · What New Jersey actually generates