Middlesex Apple Orchard Solar
Solar power plant · Middlesex County, New Jersey
Nameplate capacity
4.7 MW
Rank in New Jersey
#141
of 425 plants
In service since
2013
April 2013
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- CVI CleanCapital Solar 4 LLC
- County
- Middlesex County
- Generating units
- 2
- Share of state capacity
- 0.03%
- Rank among solar plants in New Jersey
- #78 of 343
- EIA plant code
- 58090
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| SEF-2 | Solar Photovoltaic | 3.4 MW | 3.4 MW | 2013 | Operating |
| SEF-1 | Solar Photovoltaic | 1.3 MW | 1.3 MW | 2013 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in New Jersey
| Paradise Solar Energy Center | Solar | 5.0 MW |
| Cumberland County Solid Waste Complex | Other | 4.8 MW |
| Heller Industrial Parks | Solar | 4.6 MW |
| Morristown Medical Center | Natural gas | 4.6 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 4.7 MW solar plant and a 4.7 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All New Jersey power plants · What New Jersey actually generates