Home / Power plants / Nevada / Turquoise Liberty Solar

Turquoise Liberty Solar

Solar power plant · Washoe County, Nevada

Nameplate capacity
10 MW
Rank in Nevada
#95
of 117 plants
In service since
2019
November 2019

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Liberty Utilities (CalPeco Electric) LLC
County
Washoe County
Generating units
1
Share of state capacity
0.05%
Rank among solar plants in Nevada
#47 of 59
EIA plant code
62980

Generating units

Individual generating units at Turquoise Liberty Solar
UnitTechnologyNameplateSummerOnlineStatus
PVSolar Photovoltaic10 MW10 MW2019Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Nevada

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 10 MW solar plant and a 10 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Nevada power plants · What Nevada actually generates