CM10

Solar power plant · Clark County, Nevada

Nameplate capacity
10 MW
Rank in Nevada
#93
of 117 plants
In service since
2008
December 2008

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
RWE Clean Energy
County
Clark County
Generating units
1
Share of state capacity
0.05%
Rank among solar plants in Nevada
#46 of 59
EIA plant code
56944

Generating units

Individual generating units at CM10
UnitTechnologyNameplateSummerOnlineStatus
PV01Solar Photovoltaic10 MW10 MW2008Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Nevada

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 10 MW solar plant and a 10 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Nevada power plants · What Nevada actually generates