Silver Peak
Battery storage power plant · Clark County, Nevada
Nameplate capacity
279 MW
Rank in Nevada
#16
of 117 plants
In service since
2025
June 2025
Details
- Primary fuel
- Battery storage
- Technology
- Batteries
- Operator
- Silver Peak Solar, LLC
- County
- Clark County
- Generating units
- 3
- Share of state capacity
- 1.47%
- Rank among battery storage plants in Nevada
- #1 of 4
- EIA plant code
- 67736
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| SP3 | Batteries | 110 MW | 110 MW | 2025 | Operating |
| SP2 | Batteries | 109 MW | 109 MW | 2025 | Operating |
| SP1 | Batteries | 60 MW | 60 MW | 2025 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Nevada
| Eagle Shadow Mountain Solar Farm | Solar | 300 MW |
| Escape Solar Plant | Solar | 285 MW |
| Arrow Canyon Solar Hybrid | Solar | 275 MW |
| Townsite Solar Project Hybrid | Solar | 270 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 279 MW solar plant and a 279 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Nevada power plants · What Nevada actually generates