Home / Power plants / Nevada / Arrow Canyon Solar Hybrid

Arrow Canyon Solar Hybrid

Solar power plant · Clark County, Nevada

Nameplate capacity
275 MW
Rank in Nevada
#17
of 117 plants
In service since
2023
December 2023

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Arrow Canyon Solar LLC
County
Clark County
Generating units
2
Share of state capacity
1.45%
Rank among solar plants in Nevada
#4 of 59
EIA plant code
62248

Generating units

Individual generating units at Arrow Canyon Solar Hybrid
UnitTechnologyNameplateSummerOnlineStatus
1Solar Photovoltaic200 MW200 MW2023Operating
2Batteries75 MW75 MW2023Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Nevada

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 275 MW solar plant and a 275 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Nevada power plants · What Nevada actually generates