Thunderhead Wind Energy LLC
Wind power plant · Antelope County, Nebraska
Nameplate capacity
300 MW
Rank in Nebraska
#12
of 138 plants
In service since
2022
November 2022
Details
- Primary fuel
- Wind
- Technology
- Onshore Wind Turbine
- Operator
- Invenergy Services LLC
- County
- Antelope County
- Generating units
- 1
- Share of state capacity
- 2.47%
- Rank among wind plants in Nebraska
- #4 of 33
- EIA plant code
- 62956
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| GEN1 | Onshore Wind Turbine | 300 MW | 300 MW | 2022 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Nebraska
| Rattlesnake Creek Wind Project | Wind | 318 MW |
| Milligan 1 Wind Farm | Wind | 300 MW |
| Haystack Wind Project, LLC | Wind | 298 MW |
| Rokeby | Natural gas | 266 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 300 MW solar plant and a 300 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Nebraska power plants · What Nebraska actually generates