Hardy

Hydro power plant · Newaygo County, Michigan

Nameplate capacity
32 MW
Rank in Michigan
#101
of 289 plants
In service since
1931
June 1931

Details

Primary fuel
Hydro
Technology
Conventional Hydroelectric
Operator
Consumers Energy Co - (MI)
County
Newaygo County
Generating units
3
Share of state capacity
0.09%
Rank among hydro plants in Michigan
#3 of 51
EIA plant code
1707

Generating units

Individual generating units at Hardy
UnitTechnologyNameplateSummerOnlineStatus
3Conventional Hydroelectric12 MW12 MW1931Operating
1Conventional Hydroelectric10 MW11 MW1931Operating
2Conventional Hydroelectric10 MW11 MW1931Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Michigan

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 32 MW solar plant and a 32 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Michigan power plants · What Michigan actually generates