Home / Power plants / Michigan / Big Turtle Wind Farm 2

Big Turtle Wind Farm 2

Wind power plant · Huron County, Michigan

Nameplate capacity
29 MW
Rank in Michigan
#103
of 289 plants
In service since
2016
October 2016

Details

Primary fuel
Wind
Technology
Onshore Wind Turbine
Operator
DTE Electric Company
County
Huron County
Generating units
1
Share of state capacity
0.08%
Rank among wind plants in Michigan
#31 of 34
EIA plant code
65143

Generating units

Individual generating units at Big Turtle Wind Farm 2
UnitTechnologyNameplateSummerOnlineStatus
BTWF2Onshore Wind Turbine29 MW29 MW2016Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Michigan

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 29 MW solar plant and a 29 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Michigan power plants · What Michigan actually generates