ZPD-PT Solar Project 2017-006 LLC Hybrid
Solar power plant · Worcester County, Massachusetts
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- AES Distributed Energy
- County
- Worcester County
- Generating units
- 2
- Share of state capacity
- 0.05%
- Rank among solar plants in Massachusetts
- #44 of 531
- EIA plant code
- 64395
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| DRAPV | Solar Photovoltaic | 4.0 MW | 4.0 MW | 2021 | Operating |
| DRAES | Batteries | 2.5 MW | 4.0 MW | 2021 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Massachusetts
| CED Northampton Solar LLC Hybrid | Solar | 6.6 MW |
| Worcester Landfill | Solar | 6.5 MW |
| Dartmouth | Solar | 6.3 MW |
| Maple(CSG) | Solar | 6.3 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 6.5 MW solar plant and a 6.5 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Massachusetts power plants · What Massachusetts actually generates