Home / Power plants / Massachusetts / Wellesley College Central Utility Plant

Wellesley College Central Utility Plant

Other power plant · Norfolk County, Massachusetts

Nameplate capacity
14 MW
Rank in Massachusetts
#53
of 686 plants
In service since
1985
June 1985

Details

Primary fuel
Other
Technology
Petroleum Liquids
Operator
Wellesley College
County
Norfolk County
Generating units
8
Share of state capacity
0.10%
Rank among other plants in Massachusetts
#15 of 25
EIA plant code
54937

Generating units

Individual generating units at Wellesley College Central Utility Plant
UnitTechnologyNameplateSummerOnlineStatus
SB1Petroleum Liquids3.0 MW4.0 MW1985Standby/Backup: available for service but not normally used
1122Natural Gas Internal Combustion Engine1.9 MW2.0 MW2021Operating
1123Natural Gas Internal Combustion Engine1.9 MW2.0 MW2021Operating
8187Natural Gas Internal Combustion Engine1.9 MW1.9 MW1999Out of service and NOT expected to return to service in next calendar year
1118Natural Gas Internal Combustion Engine1.3 MW1.2 MW1994Out of service and NOT expected to return to service in next calendar year
1119Natural Gas Internal Combustion Engine1.3 MW1.2 MW1994Out of service and NOT expected to return to service in next calendar year
1120Natural Gas Internal Combustion Engine1.3 MW1.2 MW1994Out of service and NOT expected to return to service in next calendar year
1121Natural Gas Internal Combustion Engine1.3 MW1.2 MW1994Out of service and NOT expected to return to service in next calendar year

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Massachusetts

Gillette SBMCNatural gas14 MW
ShrewsburyOther14 MW
Cherry StreetNatural gas13 MW
Barrett PVSolar12 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 14 MW solar plant and a 14 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Massachusetts power plants · What Massachusetts actually generates