Upland

Solar power plant · Plymouth County, Massachusetts

Nameplate capacity
7.3 MW
Rank in Massachusetts
#100
of 686 plants
In service since
2025
June 2025

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Greenbacker Renewable Energy Corporation
County
Plymouth County
Generating units
2
Share of state capacity
0.05%
Rank among solar plants in Massachusetts
#34 of 531
EIA plant code
67276

Generating units

Individual generating units at Upland
UnitTechnologyNameplateSummerOnlineStatus
703Solar Photovoltaic5.0 MW5.0 MW2025Operating
703BBatteries2.3 MW2.3 MW2025Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Massachusetts

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 7.3 MW solar plant and a 7.3 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Massachusetts power plants · What Massachusetts actually generates