Peru (MA)

Solar power plant · Berkshire County, Massachusetts

Nameplate capacity
3.3 MW
Rank in Massachusetts
#289
of 686 plants
In service since
2020
November 2020

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Sunrise on West Main Rd. LLC
County
Berkshire County
Generating units
1
Share of state capacity
0.02%
Rank among solar plants in Massachusetts
#189 of 531
EIA plant code
68652

Generating units

Individual generating units at Peru (MA)
UnitTechnologyNameplateSummerOnlineStatus
12Solar Photovoltaic3.3 MW3.3 MW2020Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Massachusetts

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 3.3 MW solar plant and a 3.3 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Massachusetts power plants · What Massachusetts actually generates