Home / Power plants / Massachusetts / Middleton Solar Park

Middleton Solar Park

Solar power plant · Essex County, Massachusetts

Nameplate capacity
8.0 MW
Rank in Massachusetts
#89
of 686 plants
In service since
2018
June 2018

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Novis Renewables, LLC
County
Essex County
Generating units
2
Share of state capacity
0.06%
Rank among solar plants in Massachusetts
#24 of 531
EIA plant code
63214

Generating units

Individual generating units at Middleton Solar Park
UnitTechnologyNameplateSummerOnlineStatus
MDL01Solar Photovoltaic5.0 MW5.0 MW2018Operating
MDB02Batteries3.0 MW3.0 MW2019Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Massachusetts

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 8.0 MW solar plant and a 8.0 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Massachusetts power plants · What Massachusetts actually generates