Home / Power plants / Massachusetts / Framingham State University Plant

Framingham State University Plant

Solar power plant · Middlesex County, Massachusetts

Nameplate capacity
3.2 MW
Rank in Massachusetts
#295
of 686 plants
In service since
2003
June 2003

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Framingham State University
County
Middlesex County
Generating units
10
Share of state capacity
0.02%
Rank among solar plants in Massachusetts
#194 of 531
EIA plant code
59717

Generating units

Individual generating units at Framingham State University Plant
UnitTechnologyNameplateSummerOnlineStatus
ACPVSolar Photovoltaic0.7 MW0.7 MW2011Operating
HAPetroleum Liquids0.4 MW0.4 MW2007Standby/Backup: available for service but not normally used
PPPetroleum Liquids0.4 MW0.4 MW2009Standby/Backup: available for service but not normally used
TOW2Petroleum Liquids0.4 MW0.4 MW2013Standby/Backup: available for service but not normally used
CCPVSolar Photovoltaic0.3 MW0.3 MW2011Operating
LIBPetroleum Liquids0.3 MW0.3 MW2005Standby/Backup: available for service but not normally used
MSC2Petroleum Liquids0.2 MW0.2 MW2015Standby/Backup: available for service but not normally used
NORTHPetroleum Liquids0.2 MW0.2 MW2011Standby/Backup: available for service but not normally used
WESTPetroleum Liquids0.2 MW0.2 MW2016Standby/Backup: available for service but not normally used
OCPetroleum Liquids0.1 MW0.1 MW2003Standby/Backup: available for service but not normally used

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Massachusetts

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 3.2 MW solar plant and a 3.2 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Massachusetts power plants · What Massachusetts actually generates