Cleary Flood Hybrid
Natural gas power plant · Bristol County, Massachusetts
Details
- Primary fuel
- Natural gas
- Technology
- Natural Gas Fired Combined Cycle
- Operator
- City of Taunton
- County
- Bristol County
- Generating units
- 3
- Share of state capacity
- 0.86%
- Rank among natural gas plants in Massachusetts
- #14 of 40
- EIA plant code
- 1682
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| CA9 | Natural Gas Fired Combined Cycle | 95 MW | 85 MW | 1975 | Operating |
| 9A | Natural Gas Fired Combined Cycle | 23 MW | 18 MW | 1976 | Operating |
| BS1 | Batteries | 3.0 MW | 2.9 MW | 2020 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Massachusetts
| Cranberry Point Energy Storage | Battery storage | 150 MW |
| Exelon Medway LLC | Other | 135 MW |
| Potter Station 2 | Natural gas | 116 MW |
| SEMASS Resource Recovery | Other | 99 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 121 MW solar plant and a 121 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Massachusetts power plants · What Massachusetts actually generates