342 Circuit
Battery storage power plant · Plymouth County, Massachusetts
Details
- Primary fuel
- Battery storage
- Technology
- Batteries
- Operator
- Madison Energy Investments LLC
- County
- Plymouth County
- Generating units
- 2
- Share of state capacity
- 0.01%
- Rank among battery storage plants in Massachusetts
- #25 of 38
- EIA plant code
- 69076
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| BA148 | Batteries | 1.0 MW | 1.0 MW | 2024 | Operating |
| SP148 | Solar Photovoltaic | 1.0 MW | 1.0 MW | 2024 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Massachusetts
| 201 Sturbridge B | Solar | 2.0 MW |
| 301 Chestnut Solar NG | Solar | 2.0 MW |
| 631-56 Airport Owner, LLC | Wind | 2.0 MW |
| 71 Charlotte Furnace Rd Hybrid(CSG) | Battery storage | 2.0 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 2.0 MW solar plant and a 2.0 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Massachusetts power plants · What Massachusetts actually generates