Smoky Hills Wind Project Phase II

Wind power plant · Lincoln County, Kansas

Nameplate capacity
149 MW
Rank in Kansas
#51
of 192 plants
In service since
2009
January 2009

Details

Primary fuel
Wind
Technology
Onshore Wind Turbine
Operator
Smoky Hills Wind Project II LLC
County
Lincoln County
Generating units
1
Share of state capacity
0.70%
Rank among wind plants in Kansas
#35 of 52
EIA plant code
56985

Generating units

Individual generating units at Smoky Hills Wind Project Phase II
UnitTechnologyNameplateSummerOnlineStatus
SMKIIOnshore Wind Turbine149 MW149 MW2009Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Kansas

Slate Creek Wind Project LLCWind150 MW
Fort DodgeNatural gas149 MW
SpearvilleWind149 MW
QuindaroOther144 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 149 MW solar plant and a 149 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Kansas power plants · What Kansas actually generates