FreeState Crooked Post Solar I
Solar power plant · Shawnee County, Kansas
Nameplate capacity
1.6 MW
Rank in Kansas
#162
of 192 plants
In service since
2023
March 2023
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Evergy Kansas Central, Inc
- County
- Shawnee County
- Generating units
- 1
- Share of state capacity
- 0.01%
- Rank among solar plants in Kansas
- #13 of 39
- EIA plant code
- 66883
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| FCS1 | Solar Photovoltaic | 1.6 MW | 1.6 MW | 2023 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Kansas
| Osage City Solar | Solar | 1.8 MW |
| Prairie Horizon Agri Energy | Natural gas | 1.7 MW |
| Herington | Other | 1.6 MW |
| Waste Water Plant Generator | Other | 1.6 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 1.6 MW solar plant and a 1.6 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Kansas power plants · What Kansas actually generates