Home / Power plants / Kansas / El Dorado Refinery

El Dorado Refinery

Natural gas power plant · Butler County, Kansas

Nameplate capacity
39 MW
Rank in Kansas
#78
of 192 plants
In service since
1996
January 1996

Details

Primary fuel
Natural gas
Technology
Natural Gas Fired Combustion Turbine
Operator
Frontier El Dorado Refinery LLC
County
Butler County
Generating units
1
Share of state capacity
0.18%
Rank among natural gas plants in Kansas
#19 of 54
EIA plant code
58075

Generating units

Individual generating units at El Dorado Refinery
UnitTechnologyNameplateSummerOnlineStatus
L3804Natural Gas Fired Combustion Turbine39 MW32 MW1996Standby/Backup: available for service but not normally used

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Kansas

Flat Ridge Wind Energy LLCWind44 MW
Gardner Energy CenterNatural gas39 MW
Chanute 3Natural gas35 MW
Clay CenterOther30 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 39 MW solar plant and a 39 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Kansas power plants · What Kansas actually generates