Home / Power plants / Kansas / East Fork Wind Project, LLC

East Fork Wind Project, LLC

Wind power plant · Thomas County, Kansas

Nameplate capacity
196 MW
Rank in Kansas
#41
of 192 plants
In service since
2020
March 2020

Details

Primary fuel
Wind
Technology
Onshore Wind Turbine
Operator
Engie North America
County
Thomas County
Generating units
1
Share of state capacity
0.93%
Rank among wind plants in Kansas
#28 of 52
EIA plant code
62220

Generating units

Individual generating units at East Fork Wind Project, LLC
UnitTechnologyNameplateSummerOnlineStatus
WTGSOnshore Wind Turbine196 MW196 MW2020Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Kansas

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 196 MW solar plant and a 196 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Kansas power plants · What Kansas actually generates