Home / Power plants / Iowa / Morning Light Wind Farm

Morning Light Wind Farm

Wind power plant · Adair County, Iowa

Nameplate capacity
111 MW
Rank in Iowa
#75
of 305 plants
In service since
2012
October 2012

Details

Primary fuel
Wind
Technology
Onshore Wind Turbine
Operator
MidAmerican Energy Co
County
Adair County
Generating units
1
Share of state capacity
0.45%
Rank among wind plants in Iowa
#51 of 123
EIA plant code
57875

Generating units

Individual generating units at Morning Light Wind Farm
UnitTechnologyNameplateSummerOnlineStatus
MLWFOnshore Wind Turbine111 MW101 MW2012Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Iowa

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 111 MW solar plant and a 111 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Iowa power plants · What Iowa actually generates