Hawkeye Power Partners LLC

Wind power plant · Cerro Gordo County, Iowa

Nameplate capacity
42 MW
Rank in Iowa
#111
of 305 plants
In service since
1999
April 1999

Details

Primary fuel
Wind
Technology
Onshore Wind Turbine
Operator
Hawkeye Power Partners LLC
County
Cerro Gordo County
Generating units
1
Share of state capacity
0.17%
Rank among wind plants in Iowa
#75 of 123
EIA plant code
55816

Generating units

Individual generating units at Hawkeye Power Partners LLC
UnitTechnologyNameplateSummerOnlineStatus
48MOnshore Wind Turbine42 MW42 MW1999Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Iowa

Gas Turbine (IA)Natural gas43 MW
Cerro Gordo Wind FarmWind42 MW
IndianolaOther41 MW
Elk Wind FarmWind41 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 42 MW solar plant and a 42 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Iowa power plants · What Iowa actually generates