Home / Power plants / Illinois / Rail Splitter Wind Farm

Rail Splitter Wind Farm

Wind power plant · Tazewell County, Illinois

Nameplate capacity
101 MW
Rank in Illinois
#105
of 580 plants
In service since
2009
August 2009

Details

Primary fuel
Wind
Technology
Onshore Wind Turbine
Operator
Rail Splitter Wind Farm LLC
County
Tazewell County
Generating units
1
Share of state capacity
0.19%
Rank among wind plants in Illinois
#42 of 56
EIA plant code
56856

Generating units

Individual generating units at Rail Splitter Wind Farm
UnitTechnologyNameplateSummerOnlineStatus
GEN1Onshore Wind Turbine101 MW101 MW2009Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Illinois

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 101 MW solar plant and a 101 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Illinois power plants · What Illinois actually generates