Home / Power plants / Illinois / High Point Solar LLC

High Point Solar LLC

Solar power plant · Stephenson County, Illinois

Nameplate capacity
100 MW
Rank in Illinois
#106
of 580 plants
In service since
2023
November 2023

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Acciona Energy USA Global, LLC
County
Stephenson County
Generating units
1
Share of state capacity
0.19%
Rank among solar plants in Illinois
#16 of 383
EIA plant code
63838

Generating units

Individual generating units at High Point Solar LLC
UnitTechnologyNameplateSummerOnlineStatus
HPSSolar Photovoltaic100 MW100 MW2023Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Illinois

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 100 MW solar plant and a 100 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Illinois power plants · What Illinois actually generates