Nameplate capacity
30 MW
Rank in Idaho
#41
of 155 plants
In service since
2015
July 2015
Details
- Primary fuel
- Hydro
- Technology
- Conventional Hydroelectric
- Operator
- PacifiCorp
- County
- Franklin County
- Generating units
- 3
- Share of state capacity
- 0.46%
- Rank among hydro plants in Idaho
- #16 of 76
- EIA plant code
- 829
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| 1 | Conventional Hydroelectric | 10 MW | 9.3 MW | 2015 | Operating |
| 2 | Conventional Hydroelectric | 10 MW | 9.3 MW | 2016 | Operating |
| 3 | Conventional Hydroelectric | 10 MW | 9.3 MW | 2020 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Idaho
| Smith Falls Hydro Project | Hydro | 38 MW |
| Grace | Hydro | 33 MW |
| Minidoka | Hydro | 28 MW |
| Swan Falls | Hydro | 27 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 30 MW solar plant and a 30 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Idaho power plants · What Idaho actually generates