Home / Power plants / Idaho / Horseshoe Bend Hydroelectric Co

Horseshoe Bend Hydroelectric Co

Hydro power plant · Boise County, Idaho

Nameplate capacity
9.4 MW
Rank in Idaho
#90
of 155 plants
In service since
1995
April 1995

Details

Primary fuel
Hydro
Technology
Conventional Hydroelectric
Operator
Horseshoe Bend Hydroelectric Co
County
Boise County
Generating units
2
Share of state capacity
0.14%
Rank among hydro plants in Idaho
#30 of 76
EIA plant code
54524

Generating units

Individual generating units at Horseshoe Bend Hydroelectric Co
UnitTechnologyNameplateSummerOnlineStatus
GEN1Conventional Hydroelectric4.7 MW4.7 MW1995Operating
GEN2Conventional Hydroelectric4.7 MW4.7 MW1995Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Idaho

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 9.4 MW solar plant and a 9.4 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Idaho power plants · What Idaho actually generates