Clif Bar Bakery of Twin Falls
Solar power plant · Twin Falls County, Idaho
Nameplate capacity
1.6 MW
Rank in Idaho
#143
of 155 plants
In service since
2019
June 2019
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Mondelez Global LLC (Twin Falls)
- County
- Twin Falls County
- Generating units
- 1
- Share of state capacity
- 0.02%
- Rank among solar plants in Idaho
- #14 of 14
- EIA plant code
- 62151
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| PV1 | Solar Photovoltaic | 1.6 MW | 1.6 MW | 2019 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Idaho
| Mora Drop Hydroelectric Project | Hydro | 1.7 MW |
| Big Sky Dairy Digester | Other | 1.6 MW |
| Marsh Valley Development | Hydro | 1.6 MW |
| Little Mac Project | Hydro | 1.5 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 1.6 MW solar plant and a 1.6 MW nuclear plant have the same entry here and produce very different amounts of electricity.