Home / Power plants / Idaho / Clear Lake

Clear Lake

Hydro power plant · Gooding County, Idaho

Nameplate capacity
2.5 MW
Rank in Idaho
#130
of 155 plants
In service since
1937
December 1937

Details

Primary fuel
Hydro
Technology
Conventional Hydroelectric
Operator
Idaho Power Co
County
Gooding County
Generating units
1
Share of state capacity
0.04%
Rank among hydro plants in Idaho
#57 of 76
EIA plant code
814

Generating units

Individual generating units at Clear Lake
UnitTechnologyNameplateSummerOnlineStatus
1Conventional Hydroelectric2.5 MW2.2 MW1937Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Idaho

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 2.5 MW solar plant and a 2.5 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Idaho power plants · What Idaho actually generates