Home / Power plants / Colorado / Rawhide Prairie Solar Hybrid

Rawhide Prairie Solar Hybrid

Solar power plant · Larimer County, Colorado

Nameplate capacity
23 MW
Rank in Colorado
#96
of 326 plants
In service since
2021
March 2021

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Greenbacker Renewable Energy Corporation
County
Larimer County
Generating units
2
Share of state capacity
0.10%
Rank among solar plants in Colorado
#23 of 184
EIA plant code
63722

Generating units

Individual generating units at Rawhide Prairie Solar Hybrid
UnitTechnologyNameplateSummerOnlineStatus
PV1Solar Photovoltaic22 MW22 MW2021Operating
BA1Batteries1.0 MW1.0 MW2021Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Colorado

TeslaHydro27 MW
Green MountainHydro26 MW
High Mesa COBattery storage22 MW
Mamm CreekBattery storage22 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 23 MW solar plant and a 23 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Colorado power plants · What Colorado actually generates