Green Mountain
Hydro power plant · Summit County, Colorado
Nameplate capacity
26 MW
Rank in Colorado
#95
of 326 plants
In service since
1943
May 1943
Details
- Primary fuel
- Hydro
- Technology
- Conventional Hydroelectric
- Operator
- U S Bureau of Reclamation
- County
- Summit County
- Generating units
- 2
- Share of state capacity
- 0.11%
- Rank among hydro plants in Colorado
- #10 of 49
- EIA plant code
- 516
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| 1 | Conventional Hydroelectric | 13 MW | 13 MW | 1943 | Operating |
| 2 | Conventional Hydroelectric | 13 MW | 13 MW | 1943 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Colorado
| Fruita | Natural gas | 27 MW |
| Tesla | Hydro | 27 MW |
| Rawhide Prairie Solar Hybrid | Solar | 23 MW |
| High Mesa CO | Battery storage | 22 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 26 MW solar plant and a 26 MW nuclear plant have the same entry here and produce very different amounts of electricity.