Home / Power plants / Colorado / Pivot Solar 32

Pivot Solar 32

Solar power plant · Morgan County, Colorado

Nameplate capacity
5.0 MW
Rank in Colorado
#156
of 326 plants
In service since
2025
September 2025

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Pivot Energy
County
Morgan County
Generating units
1
Share of state capacity
0.02%
Rank among solar plants in Colorado
#51 of 184
EIA plant code
68991

Generating units

Individual generating units at Pivot Solar 32
UnitTechnologyNameplateSummerOnlineStatus
PI32Solar Photovoltaic5.0 MW5.0 MW2025Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Colorado

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 5.0 MW solar plant and a 5.0 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Colorado power plants · What Colorado actually generates