Home / Power plants / Colorado / Pivot Solar 21

Pivot Solar 21

Solar power plant · Arapahoe County, Colorado

Nameplate capacity
5.0 MW
Rank in Colorado
#154
of 326 plants
In service since
2024
April 2024

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Pivot Energy
County
Arapahoe County
Generating units
1
Share of state capacity
0.02%
Rank among solar plants in Colorado
#49 of 184
EIA plant code
68944

Generating units

Individual generating units at Pivot Solar 21
UnitTechnologyNameplateSummerOnlineStatus
PI21Solar Photovoltaic5.0 MW5.0 MW2024Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Colorado

Pitkin County SolarSolar5.0 MW
Pivot Solar 20Solar5.0 MW
Pivot Solar 30Solar5.0 MW
Pivot Solar 32Solar5.0 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 5.0 MW solar plant and a 5.0 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Colorado power plants · What Colorado actually generates