Swift 1

Hydro power plant · Skamania County, Washington

Nameplate capacity
240 MW
Rank in Washington
#29
of 139 plants
In service since
1958
December 1958

Details

Primary fuel
Hydro
Technology
Conventional Hydroelectric
Operator
PacifiCorp
County
Skamania County
Generating units
3
Share of state capacity
0.76%
Rank among hydro plants in Washington
#15 of 73
EIA plant code
3850

Generating units

Individual generating units at Swift 1
UnitTechnologyNameplateSummerOnlineStatus
HY11Conventional Hydroelectric80 MW88 MW1958Operating
HY12Conventional Hydroelectric80 MW88 MW1958Operating
HY13Conventional Hydroelectric80 MW88 MW1958Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Washington

Windy Flats Wind ProjectWind262 MW
River Road Gen PlantNatural gas248 MW
Marengo Wind PlantWind234 MW
GorgeHydro207 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 240 MW solar plant and a 240 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Washington power plants · What Washington actually generates