Swauk Wind LLC
Wind power plant · Kittitas County, Washington
Nameplate capacity
4.3 MW
Rank in Washington
#117
of 139 plants
In service since
2012
December 2012
Details
- Primary fuel
- Wind
- Technology
- Onshore Wind Turbine
- Operator
- Gamesa Wind US LLC
- County
- Kittitas County
- Generating units
- 1
- Share of state capacity
- 0.01%
- Rank among wind plants in Washington
- #23 of 23
- EIA plant code
- 58441
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| SW | Onshore Wind Turbine | 4.3 MW | 4.3 MW | 2012 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Washington
| Darrington | Other | 4.5 MW |
| LRI LFGTE Facility | Other | 4.5 MW |
| Weeks Falls | Hydro | 4.3 MW |
| Horn Rapids Solar, Storage and Training | Solar | 4.2 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 4.3 MW solar plant and a 4.3 MW nuclear plant have the same entry here and produce very different amounts of electricity.