Home / Power plants / Washington / Priest Rapids

Priest Rapids

Hydro power plant · Grant County, Washington

Nameplate capacity
950 MW
Rank in Washington
#7
of 139 plants
In service since
1959
October 1959

Details

Primary fuel
Hydro
Technology
Conventional Hydroelectric
Operator
PUD No 2 of Grant County
County
Grant County
Generating units
10
Share of state capacity
3.00%
Rank among hydro plants in Washington
#6 of 73
EIA plant code
3887

Generating units

Individual generating units at Priest Rapids
UnitTechnologyNameplateSummerOnlineStatus
1Conventional Hydroelectric95 MW95 MW1961Operating
10Conventional Hydroelectric95 MW95 MW1959Operating
2Conventional Hydroelectric95 MW95 MW1961Operating
3Conventional Hydroelectric95 MW95 MW1960Operating
4Conventional Hydroelectric95 MW95 MW1960Operating
5Conventional Hydroelectric95 MW95 MW1960Operating
6Conventional Hydroelectric95 MW95 MW1960Operating
7Conventional Hydroelectric95 MW95 MW1960Operating
8Conventional Hydroelectric95 MW95 MW1959Operating
9Conventional Hydroelectric95 MW95 MW1959Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Washington

Columbia Generating StationNuclear1,200 MW
BoundaryHydro1,160 MW
WellsHydro867 MW
Little GooseHydro810 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 950 MW solar plant and a 950 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Washington power plants · What Washington actually generates