Nameplate capacity
70 MW
Rank in Washington
#65
of 139 plants
In service since
2015
October 2015
Details
- Primary fuel
- Hydro
- Technology
- Conventional Hydroelectric
- Operator
- Avista Corp
- County
- Lincoln County
- Generating units
- 4
- Share of state capacity
- 0.22%
- Rank among hydro plants in Washington
- #29 of 73
- EIA plant code
- 3867
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| 1 | Conventional Hydroelectric | 18 MW | 22 MW | 2015 | Operating |
| 2 | Conventional Hydroelectric | 18 MW | 23 MW | 2015 | Operating |
| 3 | Conventional Hydroelectric | 18 MW | 23 MW | 2019 | Operating |
| 4 | Conventional Hydroelectric | 18 MW | 22 MW | 2024 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Washington
| Swift 2 | Hydro | 72 MW |
| Cowlitz Falls | Hydro | 70 MW |
| LaGrande | Hydro | 64 MW |
| Nippon Dynawave Packaging Longview WA | Other | 62 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 70 MW solar plant and a 70 MW nuclear plant have the same entry here and produce very different amounts of electricity.