Home / Power plants / Washington / Linden Wind Energy Project

Linden Wind Energy Project

Wind power plant · Klickitat County, Washington

Nameplate capacity
50 MW
Rank in Washington
#74
of 139 plants
In service since
2010
June 2010

Details

Primary fuel
Wind
Technology
Onshore Wind Turbine
Operator
Los Angeles Department of Water & Power
County
Klickitat County
Generating units
1
Share of state capacity
0.16%
Rank among wind plants in Washington
#21 of 23
EIA plant code
57635

Generating units

Individual generating units at Linden Wind Energy Project
UnitTechnologyNameplateSummerOnlineStatus
LW1Onshore Wind Turbine50 MW50 MW2010Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Washington

Cushman 1Hydro50 MW
Big Horn Wind IIWind50 MW
Longview FibreOther45 MW
Little Falls (WA)Hydro43 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 50 MW solar plant and a 50 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Washington power plants · What Washington actually generates