Linden Wind Energy Project
Wind power plant · Klickitat County, Washington
Nameplate capacity
50 MW
Rank in Washington
#74
of 139 plants
In service since
2010
June 2010
Details
- Primary fuel
- Wind
- Technology
- Onshore Wind Turbine
- Operator
- Los Angeles Department of Water & Power
- County
- Klickitat County
- Generating units
- 1
- Share of state capacity
- 0.16%
- Rank among wind plants in Washington
- #21 of 23
- EIA plant code
- 57635
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| LW1 | Onshore Wind Turbine | 50 MW | 50 MW | 2010 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Washington
| Cushman 1 | Hydro | 50 MW |
| Big Horn Wind II | Wind | 50 MW |
| Longview Fibre | Other | 45 MW |
| Little Falls (WA) | Hydro | 43 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 50 MW solar plant and a 50 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Washington power plants · What Washington actually generates