Harvest Wind Project

Wind power plant · Klickitat County, Washington

Nameplate capacity
99 MW
Rank in Washington
#56
of 139 plants
In service since
2009
December 2009

Details

Primary fuel
Wind
Technology
Onshore Wind Turbine
Operator
Harvest Wind Project TIC
County
Klickitat County
Generating units
1
Share of state capacity
0.31%
Rank among wind plants in Washington
#17 of 23
EIA plant code
57152

Generating units

Individual generating units at Harvest Wind Project
UnitTechnologyNameplateSummerOnlineStatus
HWP1Onshore Wind Turbine99 MW99 MW2009Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Washington

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 99 MW solar plant and a 99 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Washington power plants · What Washington actually generates