Home / Power plants / Washington / Goose Prairie Solar

Goose Prairie Solar

Solar power plant · Yakima County, Washington

Nameplate capacity
80 MW
Rank in Washington
#62
of 139 plants
In service since
2024
December 2024

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Goose Prairie Solar LLC
County
Yakima County
Generating units
1
Share of state capacity
0.25%
Rank among solar plants in Washington
#2 of 7
EIA plant code
67261

Generating units

Individual generating units at Goose Prairie Solar
UnitTechnologyNameplateSummerOnlineStatus
GOOSESolar Photovoltaic80 MW80 MW2024Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Washington

Vantage Wind Energy LLCWind90 MW
Cushman 2Hydro85 MW
Swift 2Hydro72 MW
Cowlitz FallsHydro70 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 80 MW solar plant and a 80 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Washington power plants · What Washington actually generates