NewYork-Presbyterian Brooklyn Methodist
Other power plant · Kings County, New York
Nameplate capacity
5.9 MW
Rank in New York
#293
of 1,152 plants
In service since
2006
January 2006
Details
- Primary fuel
- Other
- Technology
- Petroleum Liquids
- Operator
- NewYork-Presbyterian Brooklyn Methodist Hospital
- County
- Kings County
- Generating units
- 6
- Share of state capacity
- 0.01%
- Rank among other plants in New York
- #53 of 99
- EIA plant code
- 52091
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| CCHEG | Petroleum Liquids | 1.5 MW | 1.5 MW | 2020 | Standby/Backup: available for service but not normally used |
| 02-8P | Petroleum Liquids | 1.0 MW | 1.0 MW | 2006 | Operating |
| 03-8L | Petroleum Liquids | 1.0 MW | 1.0 MW | 2008 | Operating |
| 01-8N | Petroleum Liquids | 0.8 MW | 0.8 MW | 2006 | Operating |
| 04-6Z | Petroleum Liquids | 0.8 MW | 0.8 MW | 2006 | Standby/Backup: available for service but not normally used |
| 05-6Z | Petroleum Liquids | 0.8 MW | 0.8 MW | 2006 | Standby/Backup: available for service but not normally used |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in New York
| Stuyvesant Falls | Hydro | 6.0 MW |
| MM Albany Energy | Other | 5.9 MW |
| US Gypsum Oakfield | Natural gas | 5.8 MW |
| Black River Hydro Associates | Hydro | 5.7 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 5.9 MW solar plant and a 5.9 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All New York power plants · What New York actually generates