Geer Road Solar 3 CSG
Solar power plant · Washington County, New York
Nameplate capacity
5.0 MW
Rank in New York
#396
of 1,164 plants
In service since
2026
June 2026
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- AES Clean Energy
- County
- Washington County
- Generating units
- 1
- Share of state capacity
- 0.01%
- Rank among solar plants in New York
- #128 of 735
- EIA plant code
- 67413
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| GEER3 | Solar Photovoltaic | 5.0 MW | 5.0 MW | 2026 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in New York
| Geer Road Solar 1 CSG | Solar | 5.0 MW |
| Geer Road Solar 2 CSG | Solar | 5.0 MW |
| Geneseo Solar | Solar | 5.0 MW |
| Geneva CSG 1 LLC | Solar | 5.0 MW |
About this data
From EIA’s inventory of operable generators, August 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 5.0 MW solar plant and a 5.0 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All New York power plants · What New York actually generates